

T W E S S u p p l y T r a d i n g C o r p.
Completed Projects:
.png)
Client: Trends And Technology
Project: Sky Cable Optical Node segmentation, October 2015
Area: Las Pinas, Paranaque, Taguig Philippines
Scope: Fiber and coaxial splicing, forward, and reverse activation in Las Pinas, Paranaque, and Taguig.
Contact Person: Rodgerson Dy
Business Unit Head
Mobile Nos. 0917 5269141
Hasan Fard
Chairman & CEO
Mobile Nos. 0917 5269140

Client: Ricklee Enterprises
1) Project: Sky Cable GPON/ FTTU Construction November 2015 Commerce Industry Plaza (CIP) Taguig.
2) Project: Sky Cable GPON/ FTTU Construction, June 2016 Rockwell Luna Building, Makati
3) Project: Sky Cable GPON/ FTTU Construction, July 2016
RCBC Tower 1 and 2, Makati
Scope:
a. Supply of hardware and materials.
b. Installation of hangers, metal boxes, and conduits.
c. Installation of fiber cable in conduits.
d. Installations and terminations of NAP’s and LCP’s.
e. Splicing and termination of fiber optic cable.
f. Testing and commissioning of build network.
4) Project: VXI Coaxial Structured Cabling
Munoz, QC, Philippines
Scope:
a. Supply of hardware and materials.
b. Installation of hangers, metal boxes, and conduits.
c. Installation of Coaxial cable in conduits.
d. Testing and commissioning.
Contact Persons: Wilbert Sy
Project Manager
Mobile Nos. 0917-8953202
Eduard Cheng
VP for Engineering
Mobile Nos. 0917-8601520

Client: Technology Link Int’l Corporation
1) Project: Wifi Network Installation in RCI Warehouses (phase 1, 7 warehouses), May 2016. Location: Republic Chemicals Inc. Warehouse in Cabuyao, Laguna.
2) Project: Wifi Network Installation in RCI Warehouses (phase 2, 4 warehouses), July 2016. Location: Republic Chemicals Inc. Warehouse in Cabuyao, Laguna.
3) Project: Wifi Network Installation in LG Warehouses, January 2017. Location: LG, F. Legaspi, Pasig City.
Scope:
e. Supply of hardware and materials.
f. Installation of hangers, metal boxes, and conduits.
g. Installation of CAT-6 UTP cable in conduits.
h. Testing and commissioning.
Contact Persons:
Alvin Salonga
Technical Manager
Mobile Nos. 0917-1204917
Client: Barangay Mahabang Parang, Angono Rizal, December 2017
Project: Metrowide CCTV Network
Scope:
a. Laying and termination of 5.23 km. of Fiber backbone from HO to the various Fiber HUB’s.
b. Laying and terminations of 3.60 km. of RG-6 Siamese Coaxial Cable for 16 Outdoor cameras.
c. Installation of 16 Outdoor Cameras and 4 Fiber Hubs in various locations in Brgy. Mahabang Parang.
d. Set-up of Monitoring Center.
e. Testing and commissioning.
Contact Person:
Ms. Laura Lobarbio
General Government Contractor
Mobile nos. 0999-4258565
Client: Barangay San Roque, Angono Rizal, June 2018
Project: Metrowide CCTV Network
Scope:
f. Laying and termination of 1.73 km. of Fiber backbone from HO to the various Fiber HUB’s.
g. Laying and terminations of 2.80 km. of RG-6 Siamese Coaxial Cable for 12 Outdoor cameras.
h. Installation of 12 Outdoor Cameras and 2 Fiber Hubs in various locations in Brgy. San Roque.
i. Set-up of Monitoring Center.
j. Testing and commissioning.
Contact Person:
Ms. Joy Arceo
Community Relation Manager
Lafarge Holcim Mobile nos. 0998-8435945
Client: Barangay San Pedro, Angono Rizal, May 2018
Project: Metrowide CCTV System
Scope:
k. Laying and termination of 1.23 km. of Fiber backbone from HO to the Fiber HUB.
l. Laying and terminations of 1.60 km. of RG-6 Siamese Coaxial Cable for 6 Outdoor cameras.
m. Installation of 6 Outdoor Cameras and 1 Fiber Hub in various locations in Brgy. San Roque.
n. Set-up of Monitoring Center.
o. Testing and commissioning.
Contact Person: Ms. Joy Arceo
Community Relation Manager
Lafarge Holcim Mobile nos. 0998-8435945
CLIENT: WUHAN FIBERHOME INT’L TECHNOLOGIES:
-
Project: CONVERGE FTTH - GPON Build-up in –MUNTINLUPA (ParkhomesTunasan) January 27, 2017.
-
Project: CONVERGE FTTH - GPON Build-up in – St. Francis Condominium (with Slab Scanning ) February 15, 2017.
-
Project: CONVERGE FTTH - GPON Build-up in One Jeroma Place ( Congressional Ave. Ext. Quezon City – February 23, 2017.
-
Project: PLDT FTTE - GPON Build-up in Figaro Solutions Inc, February 24, 2017.
-
Project: Converge/ IBS- FTTU Build-up in Studio City Tower 1-5, March 2017 Location: Alabang, Metro Manila.
-
Project: Converge/ IBS- FTTU Build-up in Aspen Tower, March 2017 Location: Alabang, Metro Manila.
-
Project: Converge/ IBS- FTTU Build-up in St. Francis Condo, March 2017 Location: Greenhills, San Juan, Metro Manila.
-
Project: Converge/ IBS- FTTU Build-up in Crisanta Tower, March 2017 Location: Pasig City
-
Project: Smart FBTS Link in -Makati, Dian Cell Site- Palanan Cell Site, March 15, 2017.
-
Project: CONVERGE FTTH - GPON Build-up in - THREE JEROMA PLACE (Congressional Ave, Ext. Quezon City – February 23, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (Makabayan Health Center) – March 08, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in -MANDALUYONG (Maria Clara Health Center) – March 08, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG ( Mauway Health Center) – March 08, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (Mandaluyong Health Center) – March 08, 2017.PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (Plainview Health Center) – March 08, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG Maysilo Circle Park – March 08, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (J.Dela Pena Health Center) – March 08, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Sta. Elena Health Center) - March 08, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Marikina Library) - March 08, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Freedom Park)- March 08, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – SOUTH (Shipco Transport Philippines) Inc. – March 08, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (Buayang Bato Health Center) – March 08, 2017.
-
Project: CONVERGE FTTH - GPON Build-up in – ISLAND PALM TOWER CONDOMINIUM (34 N. Domingo Ave. New Manila, Quezon, City) – March 20, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – GMM SOUTH (W Fifth – FTTB) – March 23, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (National Center for Mental Health) – March 09, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (Highway Hills Health Center) –March 09, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (Welfareville Health Center) – March 20, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in MANDALUYONG (Harapin ang Bukas Health Center) – March 15, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (Zaniga Health Center) – March 09, 2017.
-
Project: CONVERGE FTTH - GPON Build-up in –Three Jeroma Place (Congressional Ave Ext. Quezon, City Additional – March 29,2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (Makabayan Health Center) Additional – March 29,2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in - MANDALUYONG (Highway Hills Health Center) – March 29,2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (Rizal Technology University) March 28, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – Marikina (PugadLawin Health Center) – March 30, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – Marikina (Evolution Park) – March 30, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – Marikina (Nangka Health Center) – March 30, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – Marikina (Balubad Health Center) – March 30, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – (Municipal of San Mateo) – March 31, 2017.
-
Project: Converge/ IBS- FTTU Build-up in Island Palm Condo, April 2017 Location: Greenhills, San Juan, Metro Manila.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (Malamig Health Center) – April 10, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (Hulo People’s Health Center) – April 10, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Concepcion Uno Health Center) – May 11, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in - MARIKINA (Concepcion Dos Health Center) – May 11, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Cityhood Park) – May 11, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Sto. Nino Health Center) – May 11, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – ANGON RIZAL (Rizal Provincial Hospital Angono Annex) – April 18, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MORONG RIZAL (Rizal Province Hospital) – April 18, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – TAYTAY RIZAL (Taytay Emergency Hospital) – April 18, 2017.
-
Project: PLDT E2E FTTE Link in – QUEZON CITY (Greenpeace Sea Environmental Trust Inc.) – April 18, 2017.
-
Project: PLDT E2E FTTE Link in – QUEZON CITY (Continental Court Bldg (Dr.Ventura)) – April 18, 2017.
-
Project: PLDT E2E FTTE Link in – MANILA (UP Manila-National Institute of Health) – April 18, 2017.
-
Project: CONVERGE FTTH - GPON Build-up in – CRISANTA TOWER (325 Captain Javier St. Brgy. Oranbo, Pasig City) – April 19, 2017.
-
Project: CONVERGE FTTH - GPON Build-up in – GOTACO BLDG 1&2 (74 Valencia St. Quezon City) – April 19, 2017.
-
Project: PLDT E2E FTTE Link in – RIZAL (Municipality of Angono) – April 25, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Barangka Health Center) – May 11, 2017.
-
Project: PLDT E2E FTTE Link in – MANILA (UP Manila – National Institute of Health) – May 16, 2017.
-
Project: PLDT E2E FTTE Link in – QUEZON CITY (D&L Industries) – May 15, 2017.
-
Project: PLDT E2E FTTE Link in – MANILA (Espana Grand Residences Tower 2) – May 15, 2017.
-
Project: PLDT E2E FTTE Link in – VALENZUELA (Bestank Manufacturing Corp) – May 15, 2017.
-
Project: PLDT E2E FTTE Link in – ANTIPOLO (Tanay Rural Bank Inc.) – May 15, 2017.
-
Project: PLDT E2E FTTE Link in – PASIG (Comclark Network and Technology Corp) – May 15, 2017.
-
Project: PLDT E2E FTTE Link in – QUEZON CITY (Bureau of Fisheries and Aquatic Resources) – May 15, 2017.
-
Project: PLDT E2E FTTE Link in – QUEZON CITY (Department of Interior and Local Government) – May 20, 2017.
-
Project: PLDT E2E FTTE Link in – CAINTA (Tanay Rural Bank Inc.) – May 15, 2017.
-
Project: PLDT E2E FTTE Link in – ANTIPOLO RIZAL (Cherry Fodorama) – May 20, 2017.
-
Project: PLDT E2E FTTE Link in – PASIG (Htech Corporation (Rosario)) – May 23, 2017.
-
Project: PLDT E2E FTTE Link in – PASIG (HTech Corporation (Mercedes)) – May 23,2017.
-
Project: PLDT E2E FTTE Link in – MANILA (Maxicare) – May 25, 2017.
-
Project: PLDT E2E FTTE Link in – QUEZON CITY (Motor and Carriage Inc.) – May 25, 2017.
-
Project: PLDT E2E – FTTE Link in - PASIG (Bramante Commercial Center) – May 26, 2017.
-
Project: PLDT E2E FTTE Link in – PASIG (45 San Miguel) – May 26, 2017.
-
Project: PLDT E2E FTTE Link in – PASIG (Greenhills Christian Fellowship) – May 26, 2017.
-
Project: Converge/ IBS- FTTU Build-up in Alpha Grandview Hotel, June 2017 Location: Malate, Metro Manila.
-
Project: PLDT/ IBS- FTTU Build-up in Taipan Tower, June 2017 Location: Ortigas, Pasig
-
Project: CONVERGE FTTH - GPON Build-up in – ALPHA GRAND VIEW CONDOMINIUM ( 1716 MH Del Pilar St. Malate, Manila) – June 02, 2017.
-
Project: SKYRISE FTTH GPON Build-up in – MAPRE INSULAR CORPORATE CENTER (MBP, Alabang, Muntinlupa) – June 13, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Olandes Health Center) – June 21, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Industrial Valley Complex Park) – June 21, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MANDALUYONG (Barangka Ilaya Health Center) – June 21, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (J..Dela Pena Health Center) – June 21, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Balubad Health Center) – June 21, 2017.
-
Project: CONVERGE FTTH - GPON Build-up in - INSULAR HEALTH CARE BUILDING (167 Legaspi St. Cor. Dela Rosa St. Legaspi Village, Makati City) – July 03, 2017.
-
Project: CONVERGE FTTH - GPON Build-up in – INSULAR LIFE BUILDING (Paseo de Roxas cor. Ayala Ave. Makati, City) – July 03, 2017.
-
Project: PLDT E2E FTTU - GPON Build-up in PASIG (Taipan Place). July 03, 2017.
-
Project: PLDT E2E FITL Link – GMM (Antipolo City Valley View Drive 2) – July 14, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Marikina City Health Center)–July 22, 2017
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Olandes Health Center) Additional – July 22, 2017.
-
Project: PLDT E2E FTTE Link in – MAKATI (Raffles Makati) – July 25, 2017.
-
Project: PLDT E2E FTTE Link in - MAKATI (DBP Building) – July 25, 2017.
-
Project: PLDT E2E FTTE Link in – QUEZON CITY (Studio A) – July 25, 2017.
-
Project: Converge/ IBS- FTTU Build-up in Valencia Condo, August 2017 Location: Greenhills, San Juan, Metro Manila.
-
Project: CONVERGE FTTH - GPON Build-up in – ASPEN TOWER (Muntinlupa) – August 23, 2017
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Sta. Elena Health Center) – August 24, 2017
-
Project: PLDT E2E FTTE Link in – QUEZON CITY (Gateaway Tower/Cybergate Tower 1) – September 05, 2017
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Marikina Heights Health Center – July 12, 2017
-
Project: PLDT E2E Fiber Link for Wifi Solution in – PASIG (Dona Betang Health Center) – September 8, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – VALENCIA HILLS CONDOMINIUM (San Juan City) – August 29, 2017
-
Project: PLDT E2E FITL Link – GMM (Antipolo City Valley View Drive 2) – July 14, 2017.
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Marikina City Health Center)–July 22, 2017
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Olandes Health Center) Additional – July 22, 2017.
-
Project: PLDT E2E FTTE Link in – MAKATI (Raffles Makati) – July 25, 2017.
-
Project: PLDT E2E FTTE Link in - MAKATI (DBP Building) – July 25, 2017.
-
Project: PLDT E2E FTTE Link in – QUEZON CITY (Studio A) – July 25, 2017.
-
Project: CONVERGE FTTH - GPON Build-up in – ASPEN TOWER (Muntinlupa) – August 23, 2017
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Sta. Elena Health Center) – August 24, 2017
-
Project: PLDT E2E FTTE Link in – QUEZON CITY (Gateaway Tower/Cybergate Tower 1) – September 05, 2017
-
Project: PLDT E2E Fiber Link for Wifi Solution in – MARIKINA (Marikina Heights Health Center – July 12, 2017
-
Project: PLDT E2E Fiber Link for Wifi Solution in – PASIG (Dona Betang Health Center) – September 8, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – VALENCIA HILLS CONDOMINIUM (San Juan City) – August 29, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – STUDIO CITY TOWER 1 (West Park Drive Filinvest Corporate City Alabang Muntinlupa) – September 15, 2017
-
Project: PLDT E2E FITL Link – GMM (Cubao-Garmet FITL 2) – September 14, 2017
-
Project: PLDT E2E FITL Link – GMM (Shaw Tower Ortigas) – September 19, 2017
-
Project: PLDT E2E FTTE Link in – MANILA (Philippine Normal University) – September 18, 2017
-
Project: PLDT/ IBS- FTTU Build-up in Paseo de Roces, October 2017 Location: Makati City
-
Project: PLDT E2E FTTU - GPON Build-up – MAKATI (Paseo De Roces Tower 1) – October 02, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – STUDIO CITY TOWER 2 (Muntinlupa City) – October 5, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – INSULAR HEALTH CARE BUILDING (167 Legaspi St. Cor. Dela Rosa St. Legaspi Vill, Makati City) Additional – Oct 9, 2017
-
Project: PLDT E2E FTTE Link in – MARIKINA (FDC-Interim for Topbest Pest Inc.) – October 16, 2017
-
Project: PLDT E2E FTTE Link in – RIZAL (APT Entertainment Building, Cainta) – October 19, 2017
-
Project: PLDT E2E FITL Link – GMM (South Marikina FITL 4) – October 24, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – VALENCIA HILLS CONDOMINIUM (San Juan City) Additional – October 18, 2017
-
Project: PLDT/ IBS- FTTU Build-up in Monarch Parksuites (4 buildings), November 2017 Location: Paranaque Metro Manila
-
Project: PLDT/ IBS- FTTU Build-up in California Square Garden (7 buildings), November 2017 Location: Mandaluyong City
-
Project: PLDT E2E FTTU - GPON Build-up – PARANAQUE (Monarch Parksuites Cluster 1-4) – November 2, 2017
-
Project: PLDT E2E FTTU - GPON Build-up – QUEZON CITY (The Sky Suites Suites Tower (GA Sky Suites)) – November 6, 2017
-
Project: PLDT E2E FTTU - GPON Build-up – MANDALUYONG (California Garden Square Cluster A-F) – November 6, 2017
-
Project: PLDT E2E – PASIG (FDC – Interim for Goldilocks Bakeshop, Inc.) – November 8, 2017
-
Project: PLDT E2E – QUEZON CITY (Ortigas and Company Limited Partnership) – November 9, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – SOLER TOWER (1336 Soler St. Sta. Cruz, Manila) – November 2, 2017
-
Project: PLDT E2E FTTE Link in – GMM (SoHotel) – November 11, 2017
-
Project: PLDT E2E FBTS Link in – GMM (Binangonan 2) November 17, 2017
-
Project: PLDT E2E FTTE Link in – QUEZON CITY (XTRIX Computer Corporation) – November 21, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – ARISTA RESIDENCES (Parañaque City) – October 20, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – THE CAMBRIDGE VILL FORDHAM – CLUSTER 11 & 15 (Blk Kabisig, Floodway, Cambridge St. Cainta, Rizal) – Dec 12, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – THE IGNACIA PLACE (62 Sgt. Esguerra St. Cor. Mother Ignacia Avenue – December 6, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – DOVER HILL (San Juan City) – December 21, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – THE CAMBRIDGE VILLAGE – (CLUSTER 1-34) Block Kabisig, Floodway, Cambridge St. Cainta, Rizal) – Dec 14, 2017
-
Project: CONVERGE FTTH - GPON Build-up in – TAGUIG CITY (The Trion Towers) – January 25, 2018
-
Project: PLDT E2E FTTE Link in – GMM (The Sky Suites Tower (GA Sky Suites)) Additional – January 31, 2018
-
Project: PLDT E2E FTTE Link in – GMM (XITRIX Computer Corporation) Additional – January 31, 2018
-
Project: CONVERGE FTTH - GPON Build-up in –SAN JUAN CITY (Dover Hill) – February 5, 2018
-
Project: CONVERGE FTTH - GPON Build-up in –WILCON IT HUB (Don Chino Roces Ave, Magallanes, Makati City) – February 28, 2018
-
Project: PLDT E2E FTTE Link in – GMM (Google) – March 02, 2018
-
Project: PLDT E2E – GMM (Pasay FITL (Financial Complex Loop) – March 13,2018
-
Project: PLDT E2E FTTE Link in – GMM (RCBC PLAZA TOWER 2) – March 19, 2018
-
Project: PLDT E2E FTTE Link in – GMM (LG Electronics Philippines, Inc. (Pasig)) – March 19, 2018
-
Project: PLDT E2E FTTE Link in – GMM –(GREPALIFE BUILDING) – March 21, 2018
-
Project: PLDT E2E FTTE Link in – GMM (Global Rescue Pacific LLC Philippines) – March 25, 2018
-
Project: CONVERGE FTTH - GPON Build-up in –LPL Center (LP Leviste Street Makati City) – March 26, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – The Avenue Residences (55S Tandang Sora Ave., Novaliches, Quezon City, 1116, Metro Manila – March 26, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – ROBINSONS PLACE RESIDENCES (Tower 1&2) – April 11, 2018
-
Project: CONVERGE FTTH - GPON Build-up in -CAPRI CONDOMINIUM (W Service Road, Ayala Alabang) – April 11, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – INSULAR HEALTH CARE BUILDING )167 Legaspi St. Cor. Dela Rosa St. Legaspi Vill, Makati City) Additional – Apr 16, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – GRAND CENTURY MANSION (841 Zacateros, Sta. Cruz Manila) – April 16, 2018
-
Project: PLDT E2E FTTU - GPON Build-up – GMM (JMT Corporate Condominium) – April 19, 2018
-
Project: FTTH-SKYRISE – TAGUIG CITY (Arya Residences) – February 05, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – BSA TWIN TOWER (Mandaluyong) – May 11, 2018
-
Project: PLDT E2E – GMM (Cubao-Gamet FITL 2) – May 30, 2018
-
Project: PLDT E2E – XAVIERVILLE SQUARE CONDOMINIUM (Quezon City) – June 27, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – LEE TOWER (Manila) – July 09, 2018
-
Project: PLDT E2E – MAKATI CITY (Grepalife Building) – July 11, 2018
-
Project: FTTH-SKYRISE – QUEZON CITY (Viera Residences) – July 17, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – KNIGHT BRIDGE RESIDENCES (Makati City) – August 07, 2018
-
Project: CONVERGE FTTH - GPON Build-up in - GRAND CENTURY MANSION (841 ZACATEROS, STA. CRUZ MANILA ) August 08, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – THE AVENUE RESIDENCES (555 TandangSora Ave. Novaliches, Quezon City, 1116 Metro Manila) – August 08, 2018
-
Project: PLDT E2E – FILINVEST 3 (Alabang) – August 10, 2018
-
Project: PLDT E2E – ADMIRALTY BUILDING (Alabang) – August 10, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – BINONDO TERRACE 2 (Manila) – August 13, 2018
-
Project: PLDT E2E – BRIGHT PLACE CONDOMINIUM (Quezon City) – August 14, 2018
-
Project: FTTH-SKYRISE – ALABANG (Citibank Frabelle – August 15, 2018
-
Project: FTTH-SKYRISE – ALABANG (NOL Bldg) – August 15, 2018
-
Project: PLDT E2E – MAKATI CITY (Makati Executive Center) – August 22, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – STANFORD CONDOMINIUM (Manila) – August 28, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – ALABANG (Studio City Tower 3) – September 03, 2018
-
Project: FTTH – SKYRISE – MUNTINLUPA (Common Goal Tower) – September 12, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – MANILA (I TOWER) – September 17, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – QUEZON CITY (Bright Place Condominium) – September 12, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – MAKATI (Makati Cinema Square Tower) – September 18, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – PARANAQUE (Fountain Breeze Condominium Cluster 1-16) – September 24, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – PARANAQUE (Solemare Parksuites Cluster 1-4) – September 21, 2018
-
Project: Project: CONVERGE FTTH - GPON Build-up in – MANILA (I TOWER) – October 09, 2018
-
Project: CONVERGE FTTH - GPON Build-up in – MAKATI (One Pacific Place) – October 04, 2018
-
Project: FTTH-SKYRISE – TAGUIG CITY (Arya Residences) Additional – October 15, 2018
Scope:
-
Supply of hardware and materials.
-
Installation of hangers, metal boxes and conduits.
-
Installation of fiber cable in conduits.
-
Installations and terminations of NAP’s and LCP’s.
-
Splicing and termination of fiber optic cable.
-
Testing and commissioning of build network.
Contact Persons:
Renante Canedo
Project Manager (Converge Project)
Mobile Nos. 0915-3836399
Albert De Guzman
Project Manager (PLDT Project)
Mobile Nos. 0921-5983613
2020 COMPLETED PROJECTS
WUHAN FIBERHOME INTERNATIONAL TECHNOLOGIES PHILIPPINES INCORPORATED
1. PLDT E2E - QUEZON CITY (SUNTRUST ASMARA TOWER 2) – Additional -February 03,2020
2. PLDT E2E - QUEZON CITY (SUNTRUST SHANATA CLUSTER 8) – Additional- February 03,2020
3. PLDT E2E – MAKATI CITY (CENTURY DIAMOND TOWER) – February 10, 2020
4. PLDT E2E - BGC TAGUIG CITY (WORLD COMMERCE PLACE - TOWER 2) – Additional – Feb.13,2020
5. PLDT E2E - MAKATI CITY (CENTURY DIAMOND TOWER) -FEB.13,2020
6. PLDT E2E – QUEZON CITY (QID1-18PJPYD DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT) – February 17, 2020
7. PLDT E2E - QUEZON CITY (QID1-18PJPYD DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT-MARCH 05,2020
8. PLDT E2E-PARANAQUE CITY(PLDT SMART ONE DIGITAL STORE AYALA-MANILA BAY)ADDITIONAL-MARCH 5,2020
9. PLDT E2E-PASIG CITY(AGUSTIN 1 (FTTE)) -MARCH 5,2020
10. PLDT E2E-BGC TAGUIG CITY(WORLD COMMERCE PLACE-TOWER1)ADDITIONAL -MARCH 5,2020
11. PLDT E2E-QUEZON CITY(HIGH PARK VERTIS TOWER 1) ADDITIONAL-MARCH 5,2020
12. GLOBE HOMERUN PROJECT – NCR (STALUC-LSA01-001-G (HRNCR164A001)) – June 03,2020
13. GLOBE HOMERUN PROJECT - NCR (STALUC-LSA01-001-G (HRNCR164A00A) ADDITIONAL-JUNE 15,2020
14. NCRSTALUC-LSA01-001-G (HRNCR164A001)-JUNE 30,2020
15. GLOBE HOMERUN PROJECT-NCR PSG18-G(HRNCR147A001))ADDITIONAL-JULY 11,2020
16. QUEZON CITY(QID1-18PJPYD DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT) ADDITIONAL-JULY 15,2020
17. PLDT E2E-QUEZON CITY (QID1-18PJPYD DEPARTMENT OF INTERIOR AND LOCAL GOVERNMENT)-JULY 15,2020
18. QUEZON CITY(SUNTRUST ASMARA TOWER 2) ADDITIONAL -JULY 15,2020
19. QUEZON CITY(SUNTRUST ASMARA TOWER 2) ADDITIONAL -JULY 15,2020
20. PLDT E2E-QUEZON CITY(SUNTRUST SHANATA CLUSTER 8)ADDITIONAL-JULY 15,2020
21. PLDT-E2E-MAKATI CITY (GLORIETTA 2 -SMART ONE DIGITAL STORES)-ADDITIONAL-JULY 15,2020
22. GLOBE HOMERUN PROJECT (PSG18-G HRNCR147A001) – AUGUST 5,2020
23. GLOBE HOMERUN PROJECT STALUC_LSA01-001-G(HRNCR164A001)-AUGUST 15,2020
24. GLOBE HOMERUN PROJECT - NCR (STALUC-LSA01-001-G (HRNCR164A001)) Additional -SEPT.15,2020
25. QUEZON CITY HIGH PARK VERTIS TOWER 1 (Mobilization for Rapid Testing)
26. LIONS PARK RESIDENCES - OCT.08,2020
27. RADIANCE MANILA BAY - OCT. 08,2020
28. GLOBE HOMERUN PROJECT - NCR (STALUC-LSA01-001-G-(HRNCR164A001))Additional-OCT.08,2020
29. GLOBE HOMERUN PROJECT - NCR (STALUC-LSA01-001-G-(HRNCR164A001))Additional- OCT.08,2020
30. PLDT-E2E-MAKATI CITY (GLORIETA 2-SMART ONE DIGITAL STORES-Additional – OCT.12,2020
31. PLDT-E2E-MAKATI CITY – GLORIETTA 2 – SMART ONE DIGITAL STORES-ADDITIONAL – OCT.21,2020
32. PLDT-E2E-PASIG CITY AGUSTIN 1 FTTE-ADDITIONAL – OCT.23,2020
33. GLOBE HOMERUN-PASIG CITY-PSG18-G(HRNCR147A001-Additional – OCT.26,2020
34. PLDT-E2E-MAKATI CITY (GLORIETTA 2-SMART ONE DIGITAL STORES-ADDITIONAL – NOV.06,2020
35. PLDT-E2E-PASIG CITY AGUSTIN 1 FTTE-ADDITIONAL – NOV.20,2020
36. PLDT-E2E-PASIG CITY AGUSTIN 1 FTTE-ADDITIONAL – NOV.21,2020
37. PLDT-E2E-PASIG CITY AGUSTIN 1 FTTE-ADDITONAL – NOV.21,2020
38. PLDT-E2E-PARANAQUE CITY-PLDT SMART ONE DIGITAL STORE AYALA MANILA BAY-ADDITIONAL – NOV.27,2020
39. PLDT-E2E-MAKATI CITY CENTURY DIAMOND TOWER FTTE-NOV.27,2020
40. PLDT-E2E-MAKATI CITY CENTURY DIAMOND TOWER-ADDITIONAL – NOV.27,2020
41. FTTH CONVERGE-PARAÑAQUE CITY – LIONS PARK RESIDENCES-ADDITIONAL – NOV.27,2020
42. PLDT-E2E-QUEZON CITY SUNTRUST ASMARA TOWER 2-ADDITIONAL – DEC.04,2020
43. PLDT-E2E-QUEZON CITY-SUNTRUST SHANATA CLUSTER 8-ADDITIONAL DEC.04,2020
44. PLDT-E2E-MAKATI CITY-CENTURY DIAMOND TOWER -ADDITIONAL – DEC.04,2020
45. PLDT-E2E-QUEZON CITY-VERTIS HIGH PARK VERTIS TOWER 1-ADDITIONAL – DEC.05,2020
46. FTTH-CONVERGE-PASAY CITY-RADIANCE MANILA BAY- DEC.07,2020
47. PLDT-E2E-PASIG CITY- AMBERLAND PLAZA- DEC.09,2020
48. PLDT-E2E-PASIG CITY -CITY & LAND MEGA PLAZA – DEC.09,2020
49. SKY-IBS-GMM-TRIPH- OMM CITRA – DEC.09,2020
50. GLOBE HOMERUN PROJECT RIZAL (STALUC -ADDITIONAL-DEC.14,2020
CLIENT: LAFARGE HOLCIM
-
Brgy. San Roque
Project: Metro-wide CCTV Network, May 2018
Scope:
-
Laying and termination of 1.73 km. of Fiber backbone from HO to the various Fiber HUB’s.
-
Laying and terminations of 2.80 km. of RG-6 Siamese Coaxial Cable for 12 Outdoor cameras.
-
Installation of 12 Outdoor Cameras and 2 Fiber Hubs in various locations in Brgy. San Roque.
-
Set-up of Monitoring Center.
-
Testing and commissioning.
-
Brgy. San Pedro, Angono Rizal
Project: Metro-wide CCTV System, May 2018
Scope:
-
Laying and termination of 1.23 km. of Fiber backbone from HO to the Fiber HUB.
-
Laying and terminations of 1.60 km. of RG-6 Siamese Coaxial Cable for 6 Outdoor cameras.
-
Installation of 6 Outdoor Cameras and 1 Fiber Hub in various locations in Brgy. San Roque.
-
Set-up of Monitoring Center.
-
Testing and commissioning.
Contact Person:
Ms. Joy Arceo
Community Relation Manager
Lafarge Holcim
Mobile nos. 0998-8435945
CLIENT: PLANET CABLE INC.
1-Project: FTTH Network (GPON) Design and Build-up.
-
Maia Alta Subd.(27 kms.), Antipolo City.
-
Mia Vita Subd. (5 kms.), Antipolo City
-
La Hacienda Subd. (24 kms.), Teresa, Rizal
-
Empressa Subd. (12 kms.), San Fernando, Pampanga
-
Bria/Camella Rizal (10 kms), Binangonan, Rizal.
-
Camella Sierra (7 kms.), Antipolo City
Scope:
-
Formulation of design.
-
Fiber Optic Cable laying (both underground and aerial).
-
Installation of NAP’s and LCP’s including splicing and termination of FOC.
-
Testing and commissioning of the entire FTTH network.
2- Project: HFC Installation, Service and Maintenance, Antipolo, and Bacoor City.
Scope:
-
Service repairs, installations, and maintenance of the entire Antipolo Cable Network.
Contact Person:
Mr. Mike Carig
Business Development Head
Mobile Nos. 0917-1069586
CONTACT INFORMATION:
TWESSupply Trading Corp.
Block 2, Lot 11, Unamonte Subd.
Brgy. San Roque, Angono Rizal, Philippines
Off. Nos. (02)7218-0064, (+63) 0917-8950910

